 === METHOD === 
Two sets of twin tube (⌀ 8.0 cm) sediment traps were placed in between units of tube-nets (‘Mid-farm’), in close proximity to a net (‘Net’) and at the reference station. Tubes were filled with filtered (0.45 µm) seawater from the sites and were positioned 1.5 m above the seabed. Traps were uncapped at depth by SCUBA diver and replaced with pre-filled capped tubes after 24-48-hour durations. Total particulate matter (TPM) was determined by vacuum-assisted filtration of water samples through pre-dried Whatman GF/C glass microfiber filters (47 mm), which were dried at 80°C for > 48 hours and weighed to the nearest 0.1 mg. The filters were then combusted in a muffle furnace at 500°C for 4 hours and weighed for determination of particulate organic matter (POM). 



 === FIELD EXPLANATION ===
Site - sampling site (Ref, Farm)

Day - sampling day (1, 2, 3)

Sample - replicate tubes (1, 2, 3, 4)

Var - particulate fraction (TPM, POM)

Sampling - sampling occasion (June 2017, July 2018, October 2018, February 2019)

Value - sedimentation rate (g dry weight/m2/d)